Suzhou River downstream flood control wall reinforcement and sediment dredging project (flood control wall reinforcement and reconstruction part) 4
The project is located on the north bank of Suzhou River, starting from the east side of Zhenbei Road Bridge and ending at Baiyu Road, with a total length of 5730 shoreline.6m, of which the coastal line has 5 sections of flood control wall (total length 701.2m) has been built up to the standard, and the total length of the actual reconstructed shoreline of the flood control wall in this bid section is 5029.4m。